Búsqueda
Inicio | Sobre Valvias | Login sponsor | Sponsor Info | Valvias Tv | Contactar | Mapa del Sitio |
Valvias El portal de Válvulas y Actuadores más visitado
  Abierto a todos fabricantes y distribuidores
[+info]  
Home contact
General
Conceptos Básicos
Tipos de Válvulas
Tipos de Actuadores
Normas y Tests
Literatura Técnica
Software
Búsqueda
Válvula
Actuador
Empresa
Empresa en Mapa
Actualidad
Peticiones de Oferta
Stocks
Artículos
Noticias
Ferias
Cursos
Ofertas de Trabajo
Utilidades
Prontuario
Glosario
Links
Valvias Tv
Login sponsor
Sponsor Info
Sobre Valvias
Contactar
Mapa del sitio
Notícias English
 
Noticias del sector de las válvulas y actuadores
Tema de Búsqueda:
País:
Noticia: [31-35]/502Página: 7/101
Alstom to build “Los Humeros III” geothermal project in Mexico
12 noviembre 2013, (Francia)

Alstom signed a contract worth €30 million with the Mexican Federal Electricity Commission1 (CFE) to build the geothermal power plant “Los Humeros III – Phase A”, located in Chignautla, state of Puebla. This power plant will have an installed capacity of 25 MW and will produce an average of more than 200 GWh per year of renewable energy, equivalent to the annual energy used by 40,000 people in Mexico.

“Over the last decade, Alstom has participated in numerous geothermal power projects in Mexico, that all combined add up to nearly 200 MW of installed capacity. We are happy that Alstom’s technology will contribute to the diversification of non-fossil energy sources in the country, a goal that the current government has set to reach 35% by 2024.” said Cintia Angulo, Alstom Mexico Country President.

This Alstom turnkey project includes all of the engineering, as well as the power plant construction, set-up equipment, steam turbine, turbo generator, systems control and high voltage electric substation, and related equipment. The power plant is expected to start operations during the second quarter of 2016, and will operate using heat obtained by drilling steam extraction wells at a depth of up to 3,500 meters (11,500 ft.).

Empresa: Alstom Fuente: Alstom
VAG keeps expanding
27 mayo 2013, Mannheim (Alemania)

Since 1 April 2013, Germany's neighbour France has been numbering among VAG’s subsidiaries besides its 18 production and sales locations all over the world.
In the city of Chassieu near Lyon, which is already known as the stronghold of the French water industry, VAG Valves France S.A.R.L. is now part of the VAG-Group. Managing Directors Renaud Dumoulin and Lars Hillers as well as their five employees will now focus their activities on the fields of water and wastewater.

France is the ninth European country in which the VAG-Group has set up a sales location, which will enable the VAG-Group to offer technical service and quality management also locally in France, and will thus ensure more comprehensive customer service. Members of the General Management as well as employees from the sales team in Mannheim welcomed the new VAG members directly at the Chassieu location and will provide support in building up the new company to facilitate its first steps.
Empresa: Vag Armaturen Fuente: Vag Armaturen
Rotork Middle East opens purpose-built factory
20 mayo 2013, Bath (Reino Unido)

An Open Day at the end of April celebrated the opening of Rotork Middle East’s purpose-built factory in Dubai. Situated in the Jebel Ali Free Zone, the new premises contain offices and workshops, with initially 15 sales and technical staff and plans for further expansion

The new 600 square metre facility provides increased local support for business in flow control markets throughout the Middle East, where Rotork has been active since the 1950s. A Rotork regional presence was first established in Abu Dhabi in the 1970s.

Recent projects involving the Middle East oil and gas industries include the Abu Dhabi Crude Oil Pipeline linking Habshan and Fujairah, the Ruwais Refinery expansion and the New Doha International Airport. Rotork valve actuation and control technologies are also widely utilised in the area’s water and waste treatment, power generation, desalination, infrastructure and environmental improvement industries.

As well as holding stocks of products and spares locally, the new facility will provide a full range of valve adaptation, retrofitting, site service and asset management activity encompassing electric and fluid power actuators and associated equipment. A driving force behind the expansion is the demand for reduced project downtime, with more scope for planned, emergency and preventative maintenance.

Rotork Chief Executive Peter France and Edward Hobart, HM Consul General in Dubai, performed the ribbon-cutting ceremony, at which Graeme Mullin, HM Trade and Investment Advisor in Dubai and Terry Willis, Regional Director of the Energy Industries Council, were also present... (+)
Empresa: Rotork Fuente: Rotork
Alstom to renovate the Kaprun Hauptstufe hydropower plant in Austria
14 mayo 2013, (Francia)

Verbund Hydro Power AG has placed an order with Alstom for the renovation of two generators in the Kaprun Hauptstufe hydropower plant in Austria

This project will extend the service life and also increase the output of the M3 and M4 generators, with commissioning scheduled for April 2016. The Kaprun Hauptstufe power plant is part of a power plant group located in the Kaprun valley near Salzburg, Austria.

The two generators in Hauptstufe Kaprun have a rated power ouptput of 100 MVA each . Currently, the maximum power output of the power plant is 240 MW. Following the renovation, the total power output of the hydropower plant will increase to 270 MW, contributing to reinforce Austria’s energy supply.

Empresa: Alstom Fuente: Alstom
FMC Technologies Receives $47 Million Subsea Equipment Order for Statoil s Tyrihans Field
8 abril 2013, Houston (TX) (USA)

FMC Technologies, Inc. announced that it has received an order from Statoil (NYSE: STO) for additional subsea equipment for the Tyrihans field. The order has an estimated value of $47 million in revenue.

The Tyrihans field is located in the Norwegian Sea in water depths of 984 feet (300 meters). This order covers the supply of subsea trees and choke modules and is scheduled for delivery in 2014.

"FMC Technologies has been working with Statoil on the Tyrihans project since early in 2006," said Tore Halvorsen, FMC Technologies' Senior Vice President, Subsea Technologies. "We are pleased to continue delivering solutions to Statoil that help solve the ongoing challenges on the Norwegian Continental Shelf.
Empresa: FMC Technologies Fuente: FMC Technologies
<<1 .. 3 4 5 6 7 8 9 10 11 .. 101>>
© 2007-2013 www.valvias.com, Todos los derechos reservados.
Prohibida la reproducción total o parcial del contenido de este site, sin la autorización expresa del propietario del copyright.